Sunday, October 30, 2016

Horizontal Stabilizer complete

1.5 hrs. This week I was able to rivet half of the top side, and today my son and I completed the remaining rivets.  For some reason I had extra 4x10mm rivets and ran out of the 3.2x8mm.  Hopefully there is enough in the empennage kit to balance this out.

My thoughts so far on the Sling 4 kit compared to the Sonex.  No fabrication!  No pilot hole drilling, and upsize drilling, a lot less debuting, and very little hole reaming is required.  The kit so far is going together well. I'm sure if the kit were home in my garage workshop where I built the Sonex the empennage would be done by now.  But building at my hangar is slow, and mostly limited to weekends.

Saturday, October 22, 2016

Riveting skins on the horizontal stabilizer

3.5 hrs. - Today was the first time I've worked on the Sling in a few weeks, been busy with work and Boy Scouts.

Completed riveting the forward ribs and spar together.  My son Liam helped again today and used the rivet gun to pull the rivets for me while I reamed holes and inserted the rivets for him.


To prep the skins I removed the plastic film on the inside and deburred the punched holes with 320 grit sand paper (quick and easy way to do this).  Cleaned the surface and sprayed the mating surfaces with etching primer.


Next was clecoing on the left and right skins, and checking the tips for level (to each other).
My measurements were good so no warp is built in to the Horizontal Stabilizer.
Riveted the left skin on...
And the right skin...need to flip the HZ over and rivet the top another day.

Tuesday, October 11, 2016

Horizontal Stabilizer - front spar & ribs

1.5 hrs.  Prepped and primed the parts for the front spar, doubler plates, and nose ribs.  Components are clecoed together ready for riveting.




Monday, October 3, 2016

Horizontal Stabilzer - rear spar & ribs

2 hrs. -   Completed priming, and installed some carpet tiles on my workbench.

Was able to reassemble the 1st page of the horizontal stabilizer plans/parts with clecos.  It's now ready to rivet together.

Riveted and completed:

Saturday, October 1, 2016

Empennage progress - Horizontal Stabilizer

3 hrs. completing the inventory for the empennage kit, my son and I jumped right into the first page of the build manual:


Gathering up the parts, we temporarily fastened them together with the appropriate sized clecos (black and copper (5/32" and 1/8").  It went together quickly and was impressed with the "match hole" tooling and parts forming.
I took all of the pieces apart, and made sure the edges and holes were properly deburred...this is important for eliminating future stress cracks/fracutures.  I'm following The Airplane Factory recommendation for priming the mating surfaces.  Used a process of cleaning with Simple Green and scotchbrite pad, then dry, and spray with a self etching primer.




Work bench for empennage

1.5 hrs. - Today I constructed the work bench to assemble the empennage.  Similar to when I constructed the Sonex several years ago, I recycled part of the shipping container.  This gives me a work surface roughly 0.7M x 2M (2.7' x 6').