Sunday, March 12, 2017

Rudder Fiberglass Tip

1.5 hrs - After consulting with Craig M on the type of strobe he's using, I went ahead and made a new backing plate.  This gets connected to the fiberglass tip with two rivnuts.  The plate that TAF sends has multiple holes punched, none of which align with the 1.75" distance for the mounting holes on the AveoFlash posistrobe XP unit.



Next was to rivet the tip on with the filler panel (aluminum).  Don't forget to run the pull wire!





Rudder Skin (from Feb. 16, 2017)

2 hrs. - Forgot to post this last month...completed rivetinfmthe son of the rudder to the structure.  Began fitting the fiberglass tip, but quit when I looked at the strobe backer plate...need to research the make of strobe I plane to use.



Sunday, February 12, 2017

Flying my Sonex N629SX

While there hasn't been much time for building on the Sling, I have been keeping up my currency in the Sonex.  Gone flying twice in the last week...yesterday Liam went up with me again and we buzzed around the Honda R&D campus where I work.  The picture shows the layout of R&D and in the background is the Marysville Auto Plant (MAP) where's the Honda Accord and Acura TLX are manufactured.  To the right of the R&D campus is Transportation Research Center (TRC) of Ohio.  It's a jointly owned facility between Honda, and Ohio State University - that is used for product durability testing before cars go to mass production.



Vertical Stabilizer Structure Complete

2 hrs.  - It's been over a month since any work was done on the Sling 4.  We've had a major diversion with the remodeling and tenant finish of my wife's new office fo her medical practice.  That project has made some great progress...so this afternoon while "relaxing" I decided to step out to the garage and complete the vertical stabilizer structure.  I had previously finished the rivnuts and the forward spar and ribs.  Completed reaming out the hole s in the multiple parts of the rear spar.  Made sure I noted the holes not to rivet, and finished riveting the rear spar structure to the ribs.  Also reviewing the plans I noticed missing a doubler plate for the top rib, for the Glide Slope / Localizer / VOR antenna puck.  This is now complete.





Tuesday, January 3, 2017

Rudder structure begins

2.5 hours - While I wait for the new / replacement Rivnut tools...I started on the rudder assembly.  Began by preparing the spar and ribs, spraying with primer, and then bringing the parts home to complete in my garage workshop (where I built the Sonex).




This is what the structure looks like riveted together.  The tip rib is offset with the counterweight at the end.



Vertical stabilizer - rivnuts

1 hour - Received a new nut puller (rivnut) tool for Christmas.  After using it on 6 rivnuts the mandrel for the M3 inserts broke on me...not too happy about that.  I ended up purchasing a better tool (the one Craig M. recommends) and in the meantime the vendor responded today they will send me a replacement M3 mandrel.




Needless to say I wasn't able to complete these parts and the vertical stabilizer structure.