Labels

Friday, November 18, 2016

Elevator parts prep and begin riveting spar

3 hrs. - I've consolidated a few separate sessions into this post.  Began by prepping the elevator spar, ribs, attach angles, doubler channels, etc. by removing the plastic film, and deburring edges and holes as needed.  Primed all of the parts with self etching primer.


After the primer set it was onto following the steps in the book for item #1 and #2.


And a detailed picture of the elevator control horn and center hinge bracket with the inner ribs (rib 1 -  left and right) now attached with rivets and the AN-bolts/nuts.


No comments:

Post a Comment